CFAC and USEPA Finalize RI-FS Work Plan

Columbia Falls Aluminum Company, LLC (CFAC) and the United States Environmental Protection Agency (USEPA) have finalized the Remedial Investigation / Feasibility Study (RI/FS) Work Plan to assess historic environmental conditions at the former Anaconda Aluminum Smelter site in Columbia Falls, Montana. CFAC’s environmental consultant, Roux Associates, developed the RI/FS Work Plan that includes a road-map for performing a comprehensive assessment of the site as well as an evaluation of remedial alternatives that may be needed to address contamination from former manufacturing operations. The RI/FS Work Plan complies with applicable federal and state requirements and is incorporated as part of the Administrative Order on Consent between CFAC and USEPA.

The “CFAC RI-FS WP Executive Summary” downloads a six page document that provides an overview of the approach to conducting the RI/FS and a summary of the scope of work.

CFAC RI-FS WP Executive Summary

The “CFAC RI-FS Work Plan” and “CFAC RI-FS Work Plan Appendices” download the complete RI/FS Work Plan documents.*

CFAC RI-FS Work Plan
CFAC RI-FS Work Plan Appendices

 * These are large files that may take considerable time to download.

 

To provide comments on the RI/FS Work Plan:

  • Click here to comment directly
  • Email to: CFAC-comments@Rouxinc.com
  • Mail to:
    CFAC RI/FS Comments
    Roux Associates, Inc.
    c/o Columbia Falls Aluminum Company
    2000 Aluminum Drive
    Columbia Falls, MT 59912